  1. Bill ( Electric City )



    We want Electricity in Pakistan, Electricity now
    @11 Rs. per unit, and it will be increase after every two months
    regarding American IMF policies.

    IRAN is agree to give the Electricity on urgent basis to Pakistan very
    cheap Rates Rs. 1.18 per unit.

    Also CHINA offers to Pakistan for Electricity just 300 Rs. Monthly
    Bill and Unlimited Usage of Electricity but our government is not taking
    seriously.


    NOW THIS IS OUR TIME TO SHOW THE GOVERNMENT OUR STREGNTH. media should educate people so they can know their rights..

    [sm1:23p35n23][/sm1:23p35n23]


    Mubasshar


  2. Re: Bill ( Electric City )

    Read & Think!!!!!

    Electricity produced in Pakistan is from three main sources.

    1). Hydral
    2). Thermal (Gas/Steam/Furnace Oil)
    3). Nuclear

    There are four major power producers in country which include Water & Power Development Authority (WAPDA), Karachi Electric Supply Company (KESC), Independent Power Producers (IPPs) and Pakistan Atomic Energy Commission (PAEC).

    Below is the break-up of the installed capacity of each of these power producers (as of June-2008).

    1). WAPDA

    a). WAPDA Hydal
    Terbela 3478 MW
    Mangla 1000 MW
    Ghazi-Brotha 1450 MW
    Warsak 243 MW
    Chashma 184 MW
    Dargai 20 MW
    Rasul 22 MW
    Shadi-Waal 18 MW
    NandiPur 14 MW
    Kurram Garhi 4 MW
    Renala 1 MW
    Chitral 1 MW
    Jagran (AK) 30 MW
    Total Hydal ==> 6461 MW

    b). WAPDA Thermal
    Gas Turbine Power Station, Shadra 59 MW
    Steam Power Station, Faisalabad 132 MW
    Gas Turbine Power Station, Faisalabad 244 MW
    Gas Power Station, Multan 195 MW
    Thermal Power Station, Muzaffargarh 1350 MW
    Thermal Power Station, Guddu 1655 MW
    Gas Turbine Power Station, Kotri 174 MW
    Thermal Power Station, Jamshoro 850 MW
    Thermal Power Station, Larkana 150 MW
    Thermal Power Station, Quetta 35 MW
    Gas Turbine Power Station, Panjgur 39 MW
    Thermal Power Station, Pasni 17 MW
    Total Thermal ==> 4811 MW

    WAPDA's Total Hydal + Thermal capacity is 11272 MW.

    2). Karachi Electric Supply Company
    Thermal Power Station, Korengi 316 MW
    Gas Turbine Power Station, Korengi 80 MW
    Gas Turbine Power Station, SITE 100 MW
    Thermal Power Station, Bin Qasim 1260 MW
    Total (KESC) ==> 1756 MW


    3). Independent Power Producers (IPPs)
    Hub Power Project 1292 MW
    AES Lalpir Ltd, Mahmood Kot MuzaffarGarh 362 MW
    AES Pak Gen, Mahmood Kot MuzaffarGarh 365 MW
    Altern Energy Ltd, Attock 29 MW
    Fauji KabirWala Power Company, Khanewal 157 MW
    Gul Ahmad Energy Ltd, Korengi 136 MW
    Habibullah Coastal Power Ltd 140 MW
    Japan Power Generation, Lahore 120 MW
    Koh-e-Noor Energy Ltd, Lahore 131 MW
    Liberty Power Limited, Ghotki 232 MW
    Rousch Power, Khaniwal 412 MW
    Saba Power Company, Sheikhpura 114 MW
    Southern Electric Power Company Ltd, Raiwind 135 MW
    Tapal Energy Limited, Karachi 126 MW
    Uch Power Ltd, Dera Murad Jamali, Nasirabad 586 MW
    Attock Gen Ltd, Morgah Rawalpindi 165 MW
    Atlas Power, Sheikhpura 225 MW
    Engro Energy Ltd, Karachi ----- MW
    Kot Addu Power Company Limited (Privitized) 1638 MW

    Total (IPPs) => 6365 MW

    4). Pakistan Atomic Energy Commission
    KANUPP 137 MW
    CHASNUPP-1 325 MW
    Total (Nuclear) ===> 462 MW

    Hydal Electricity generated by WAPDA varies between two extremities i.e. between minimum of 2414 MW and maximum of 6761 MW depending upon the river flow through the whole year.

    Total Power Generation Capacity of Pakistan (including all sources) is 19855 MW and the electricity demand (as of today 20-04-2010) is 14500 MW and PEPCO is merely generating 10000 MW.

    So it is obvious that these 15-20 hrs power shutdowns in most parts of the country are not because of the lack of generation capacity but only because of IMF / World Bank policies imposed on our nation by Govt. The Power Generation companies are not buying Furnace Oil from PSO by saying they don’t have money to do that but we are all paying for Electricity that is generated from Furnace Oil. This is the reason that top refineries like PRL are operating at 40% capacities. IMF / World bank has imposed to reduce budget deficit by importing less crude oil. But due to this fact all our industries are under severe crisis. None of our political party who are in Assembly is ready to speak on it because every one is blessed by US / IMF / World Bank.

Similar Threads

  1. Replies: 0
    Last Post: 28th July 2013, 05:02 PM
  2. Replies: 0
    Last Post: 30th March 2013, 07:39 PM
  3. Philips launches electric cooker AirFryer
    By Realpaki in forum Techno Corner
    Replies: 0
    Last Post: 5th June 2012, 06:47 PM
  4. IT media city to be called Arfa Karim IT Media City Project
    By Realpaki in forum Political Discussion
    Replies: 0
    Last Post: 16th January 2012, 08:12 AM
  5. Stunt City
    By mubasshar in forum Entertainment
    Replies: 0
    Last Post: 18th September 2009, 03:29 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •